4PCS E12 Candelabra Base with 5.9 Inch Long Lead CUL Certified E12 Lamp Holder Candelabra Bulb Ring for Night Lights Chandeliers Ceiling Lights Table Lamps Black

★★★★★ 4.2 55 reviews

US$3.20
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$3.20
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Dec 3
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by
Free 30-day returns Details

Product details

Management number 250268596 Release Date 2026/09/17 List Price US$3.20 Model Number 250268596
Category

Material: plastic and metal Color: black Size: Wire length: 140mm/5.51 inches Circle: 27x20mm/1.06x0.79 inches 31x24x14mm/1.22x1x0.55 inches Package includes: 4pcs E12 candlestick base lamp holders; Check our product pictures and part numbers carefully before purchase to make sure they are compatible with your table lamp.

  • Durable material: Made of durable plastic and metal, delicate craftsmanship, not easy to damage, can be reused for a long time.
  • These lampholders are UL Listed and rated for 75W max, 125V max. current:2A. with 5.9 inches/15CM long lead.
  • Extension Cord:More connecting circuits, easy to use. Featuring screw-in installation, it is a great replacement for any candlestick socket.
  • Package Includes:You will receive 4pcs E12 Candelabra Base Sockets; easy to install and durable for a variety of lighting applications.
  • Application: Widely used in night lights/sconces/chandeliers/ceiling lights/table lamps. Can be a good replacement for any sconce socket.
ASIN B0F1D6DY3B
Color Black
Base Type Candelabra
Brand Name ZZLZX
Unit Count 4 Count
Part Number 61236-CH-4
Manufacturer ZZLZX
Material Type Metal, Plastic
Mounting Type Threaded
Number of Items 4

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.2 out of 5
★★★★★
55 ratings | 23 reviews
How item rating is calculated
View all reviews
5 stars
78% (43)
4 stars
6% (3)
3 stars
3% (2)
2 stars
2% (1)
1 star
11% (6)
Sort by

There are currently no written reviews for this product.